{"id":5183,"date":"2026-08-26T16:54:09","date_gmt":"2026-08-26T16:54:09","guid":{"rendered":"https:\/\/mpc.ge\/?p=5183"},"modified":"2026-08-26T16:54:09","modified_gmt":"2026-08-26T16:54:09","slug":"kazakhstan-seeks-eu-support-to-include-trans-caspian-energy-corridor-in-pmi-list","status":"publish","type":"post","link":"https:\/\/mpc.ge\/en\/kazakhstan-seeks-eu-support-to-include-trans-caspian-energy-corridor-in-pmi-list\/","title":{"rendered":"Kazakhstan seeks EU support to include Trans-Caspian Energy Corridor in PMI list"},"content":{"rendered":"<p>Kazakhstan is working with the European Commission on including the Trans-Caspian Green Energy Corridor project on the list of Projects of Mutual Interest (PMI).<\/p>\n<p>The Kazakh Ministry of Energy told Report&#8217;s Kazakhstan bureau that the project to develop and transmit green energy between Azerbaijan, Kazakhstan and Uzbekistan is an important initiative of trilateral energy cooperation.<\/p>\n<p>&#8220;The development of the feasibility study is currently underway, with its completion planned for January 2027,&#8221; the ministry said.<\/p>\n<p>The ministry also noted that efforts are underway to promote the project internationally.<\/p>\n<p>&#8220;To strengthen institutional support, the Kazakh side has initiated cooperation with the European Commission on including the project in the list of Projects of Mutual Interest (PMI),&#8221; the ministry said.<\/p>\n<p>Leading Italian international consulting company CESI has been selected as the consultant for developing the feasibility study.<\/p>\n<p>The financial model and key technical parameters of the project will be determined following completion of the feasibility study.<\/p>\n<p>The feasibility study is estimated to cost around 1 million euros and is being financed through grants from the Asian Development Bank and the Asian Infrastructure Investment Bank.<\/p>\n<p>On June 1, 2025, Azerenerji OJSC, KEGOC and the National Electric Grid of Uzbekistan signed a document establishing Yasil Dehliz Birliyi LLC to implement the Trans-Caspian Green Energy Corridor project connecting Central Asia with Azerbaijan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kazakhstan is working with the European Commission on including the Trans-Caspian Green Energy Corridor project on the list of Projects of Mutual Interest (PMI). The Kazakh Ministry of Energy told Report&#8217;s Kazakhstan bureau that the project to develop and transmit green energy between Azerbaijan, Kazakhstan and Uzbekistan is an important initiative of trilateral energy cooperation. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5184,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50,38],"tags":[],"class_list":["post-5183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","category-world"],"_links":{"self":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/5183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/comments?post=5183"}],"version-history":[{"count":1,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/5183\/revisions"}],"predecessor-version":[{"id":5185,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/5183\/revisions\/5185"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/media\/5184"}],"wp:attachment":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/media?parent=5183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/categories?post=5183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/tags?post=5183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}