{"id":3561,"date":"2026-08-05T18:15:58","date_gmt":"2026-08-05T18:15:58","guid":{"rendered":"https:\/\/mpc.ge\/?p=3561"},"modified":"2026-08-05T18:15:58","modified_gmt":"2026-08-05T18:15:58","slug":"azerbaijan-kazakhstan-complete-offshore-installation-of-trans-caspian-fiber-optic-cable","status":"publish","type":"post","link":"https:\/\/mpc.ge\/en\/azerbaijan-kazakhstan-complete-offshore-installation-of-trans-caspian-fiber-optic-cable\/","title":{"rendered":"Azerbaijan, Kazakhstan complete offshore installation of Trans-Caspian fiber-optic cable"},"content":{"rendered":"<p>A key stage in the construction of the Trans-Caspian fiber-optic communication line across the Caspian Sea has been completed in Kazakhstan, with the submarine cable laid along the Aktau\u2013Sumgayit route reaching the Kazakh coast.<\/p>\n<p>According to Report&#8217;s Kazakhstan bureau, citing the country&#8217;s Ministry of Artificial Intelligence and Digital Development, the project is being implemented by Kazakhtelecom JSC and AzerTelecom International.<\/p>\n<p>&#8220;The new backbone network will connect the digital infrastructure of Kazakhstan and Azerbaijan, creating a direct high-speed data transmission link between Asia and Europe. The line is expected to enhance the reliability of international communications and strengthen the transit potential of both countries,&#8221; the ministry said.<\/p>\n<p>The offshore cable-laying operation began in July 2026 and was carried out around the clock using a specialized vessel with a displacement of more than 20,000 tonnes. A team of 70 specialists participated in the work. The cable is now being connected to the coastal infrastructure.<\/p>\n<p>Construction of the onshore facilities, as well as commissioning and system testing, is scheduled to be completed in the autumn.<\/p>\n<p>Construction and operation of the line are being managed by CaspiLink B.V., a joint venture between Kazakhtelecom and AzerTelecom International. The project is being financed entirely by the operators&#8217; own funds, without the use of public budget financing.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A key stage in the construction of the Trans-Caspian fiber-optic communication line across the Caspian Sea has been completed in Kazakhstan, with the submarine cable laid along the Aktau\u2013Sumgayit route reaching the Kazakh coast. According to Report&#8217;s Kazakhstan bureau, citing the country&#8217;s Ministry of Artificial Intelligence and Digital Development, the project is being implemented by [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50,38],"tags":[],"class_list":["post-3561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","category-world"],"_links":{"self":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/3561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/comments?post=3561"}],"version-history":[{"count":1,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/3561\/revisions"}],"predecessor-version":[{"id":3563,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/posts\/3561\/revisions\/3563"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/media\/3562"}],"wp:attachment":[{"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/media?parent=3561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/categories?post=3561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mpc.ge\/en\/wp-json\/wp\/v2\/tags?post=3561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}